June 2022 - You are accessing an old version of our website. The SDGs Voluntary Commitments have been migrated here: https://sdgs.un.org/partnerships

You will be redirected to the new Partnership Platform in 10 seconds.

#SDGAction2306
Liugong Emission Reduction Plan
Description/achievement of initiative

Until 2015, the following emission reduction objects will be acheived:
Reduce chemical oxygen demand (COD) emission in waste water by 55 tons per year
Reduce paint slag emission by 120 tons per year.
Reduce SO2 and oxynitride emission by 20 tons per year and 30 tons per year respectively.
In electroplating procedure, achieve zero emission of waste water and reduce emission of chromium electroplating sludge by 80%, i.e. 40 tons per year.

Implementation methodologies

Use waste water treatment station to reuse waste water for production and greening.
Apply new coating technology “powder painting”
Remold the established coal-fired boiler and replace coal by sawdust.
Introduce wastewater reclamation technology: collating-ultrafiltration-sterilization three level combination technologies. The waste water is reused to the production process after the treatment.
Introduce new equipment and chromium electroplating wastewater treatment technology: use electrochemical methods-ultrafiltration-reverse osmosis combination technology. The waste water is reuse to the production process without emission.

Arrangements for Capacity-Building and Technology Transfer

Coordination mechanisms/governance structure

Partner(s)

Progress reports
2013
Reduce COD, paint slag, SO2, oxynitride and chromium electroplating sludge emission by 55,120, 20, 30 and 40 tons, respectively.
2014
Reduce COD, paint slag, SO2, oxynitride and chromium electroplating sludge emission by 55,120, 20, 30 and 40 tons, respectively.
2015
Reduce COD, paint slag, SO2, oxynitride and chromium electroplating sludge emission by 55,120, 20, 30 and 40 tons, respectively.
Staff / Technical expertise
New technology, R&D team, sustainable development team and Technical Managers in Business Units

Basic information
Time-frame: 0000-00-00 - 31 Mar 2015
Partners
Countries
Contact information
Huayi Lin, Strategic planning specialist, linhy@liugong.com
United Nations